Your assignment fee lives inside your repair number
Here is how wholesale deals die. You lock the house up, send it to your buyers, and the first serious one walks it and says: “Repairs are way more than you said. I can do $12,000 less.” That $12,000 doesn’t come out of the seller’s price. It comes out of your fee. This is the retrade. A retrade is when a buyer tries to lower the agreed price after reviewing the deal, usually by claiming higher repairs. It happens because your repair number was a guess and theirs has lines.
Good repair estimating software for wholesalers fixes that in three places: an itemized, photo-backed scope a buyer can check instead of re-estimate, a buyer package that answers their questions before they ask, and an offer to the seller that comes straight from that same scope. This guide covers all three, plus what to do when a buyer pushes back anyway. We make one of these tools, EstiMate, and there is a short overview of it at the end.
Why buyers retrade, and how to take the reason away
A buyer retrades for one of three reasons, and only one of them is fair:
- You missed something. The roof is worse than you priced, or there is a repair you didn’t see. That is fair, and the fix is a better walkthrough.
- They would renovate differently. They want granite where you priced laminate. That is their choice, not your mistake, as long as you priced the rehab your likely buyer actually does.
- They are testing you. A vague repair number invites a vague counter. “Repairs are higher” is easy to say about “needs about $40k.” It is much harder to say about a list of thirty lines with photos.
An itemized scope takes the second and third reason off the table and turns the first into a short, specific conversation. Which buyer to price the rehab for, a flipper or a landlord, is covered in how to estimate repairs on a wholesale deal.
The buyer package that stops retrades
When you send the deal, send the evidence with it. A buyer who can check your numbers from their phone is a buyer who makes an offer instead of a list of objections:
- The address and the access.When they can walk it, and what is occupied.
- Condition photos, by room.Every repair line next to the photo that shows it.
- The itemized scope.Lines with quantities and prices, and the finish level you priced it at.
- What is not included.Work you left out on purpose, and why.
- What still needs checking.If you couldn’t see the roof deck or test the sewer line, say so. A named unknown is a lot better than a low contingency they find out about later.
- The value behind it.The renovated comps you used for the value after repairs.
- The deal terms.Price, closing timeline, earnest money and how the assignment works.
This does something sneaky and wonderful: it changes the buyer’s question from “do I trust this wholesaler?” to “do I agree with line 14?” You can win the second conversation.
When a buyer pushes back anyway: go line by line
It will still happen. The difference is that now you can answer it. Say a buyer comes back with “repairs are $15,000 higher than yours.” Ask for their lines, put them next to yours, and sort the difference (an illustrative example):
| Where the $15,000 came from | Amount | What it is | What you do |
|---|---|---|---|
| They priced granite and new cabinets; you priced painted cabinets and laminate | $9,000 | Their finish choice | Hold your price. Show the comps your finish level matches. |
| They found soft roof decking at the back slope | $4,000 | Something you missed | Accept it. Adjust the price, or find a buyer who doesn’t need it. |
| They carry a bigger contingency | $2,000 | Their risk margin | Hold your price. Your unknowns were already named. |
A $15,000 retrade just became a $4,000 conversation, and you know exactly which $4,000 and why. Then save the revised scope, rerun your numbers and decide before you agree to anything. Your spread, and how the repair number moves your offer, are covered in MAO vs assignment fee.
What the seller sees, and what stays with you
The seller and the buyer need different things from the same scope. The buyer needs the evidence. The seller needs an offer they understand and can trust.
Your offer to the seller should come straight from the reviewed scope: the price, the closing timeline, earnest money, inspection period and how you are paying. Showing the seller the repair list can help when they think the house needs “just paint”: a priced list with their own photos is hard to argue with. But you decide what to share. The seller doesn’t need your value after repairs, your buyer’s numbers or your fee.
And speed matters. The wholesaler who walks the house, builds the scope and sends a clear offer the same day, by email or text, from the driveway, is usually the one who gets the contract. The one who goes home to “run the numbers” comes back to a seller who already signed with someone else.
Test any wholesale repair estimator on one deal
- Walk one house.Photos to an itemized scope, on site, in under an hour.
- Send yourself the buyer package.Could a buyer check every line from their phone?
- Fake a retrade.Change three lines the way a buyer would. Can you see exactly what moved and why?
- Make the seller offer.From the same scope, without retyping, sent by email or text.
- Check what the seller sees.Only what you chose to share.
Build the scope, send the proof, get the contract. Let’s go!
How EstiMate handles this
Here is how EstiMate covers what this guide describes:
- Three numbers, kept apart. Your seller offer, your buyer price and your fee, worked out before you lock the deal.
- Show the seller. Show the seller what the buyer is going to see, before the buyer says it.
- A number you can defend. Every dollar between the value after repairs and your offer, line by line, with the photos behind each repair.
- One kitchen, not five. Repeated work across photos is merged before it reaches the estimate, and every merge can be opened and split.
- Send it. Seller offers go out by email or text from the same project.
Here are those screens, working. Tap them, or press a “try me” flag where you see one:
EstiMate is on Android today, with iPhone coming soon. Try it free for a week from your first property.
Know your seller offer, your buyer price and your fee before you lock the deal.
1234 Oak Street
INVESTORShow the seller what the buyer is going to see before the buyer says it.
1234 Oak Street
AGENTYour offer isn't a gut feeling anymore. It's a number you can defend line by line.
1234 Oak Street, Providence RI
See what your buyers would actually pay
Runs this deal against every buy box in your list — rehab budget, max ARV, target ROI, city — and returns the price the market clears, not the price you need.
Five photos. Nine repairs. Not forty-five.
Tap any repair. See the photos that created the number.
Get the next guide like this one
Step-by-step guides, worksheets and templates for wholesaling and investing, sent when they’re published. Only when there’s something useful to send, and one click to unsubscribe.
We sent a one-click confirmation link — open it and new guides will start arriving. If you’d also like a free REILink account, you can create one in a moment. You’ll get:
- The REILink community
- Free calculators and tools
- Resources, contracts and legal documents
- Free education
- First access to new software to test, samples and specials
Free, no card needed.
Sign in any time at reilink.com with your email and the password you chose. New guides will arrive in your inbox.
New guides will arrive in your inbox. If you ever want the free account, it’s at reilink.com.
Questions
What is a retrade in wholesaling?
A buyer trying to lower the agreed price after reviewing the deal, usually by claiming the repairs are higher. It comes straight out of your assignment fee.
How do I stop buyers from retrading?
Send an itemized, photo-backed scope with the deal, name what you couldn’t inspect, and answer any pushback line by line instead of on the total.
Should I show the seller my repair estimate?
It can help when the seller underestimates the work. Share what helps the negotiation; your value after repairs, buyer numbers and fee stay with you.
Which buyer should I estimate repairs for?
The one you will most likely sell to. A flipper matches the renovated comps; a landlord usually does less.
Does the software calculate my best assignment fee?
An estimator shows your spread under your assumptions. What a buyer will actually pay comes from buyer data and feedback.
How fast should I get an offer to the seller?
The same day if you can. A clear offer sent from the driveway usually beats a better one that arrives tomorrow.
